Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Throughput
- Tariff Rates
- Location maps
- Participation
-
Development
- Pump Stations
- Pipeline Specifications
- Pump station and control systems upgrade
- Maintenance
- Marine Terminals
- Operations
- Throughput
- Third party users
- Infrastructure
-
Costs
- Capital Expenditure
- Operating Costs
-
Sales contracts
- TAPS Quality Bank
- TAPS Tariffs
- Marine Transportation
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes 16 images and tables including:
- Key facts: Table 1
- Trans Alaska Pipeline System Map
- Participation: Table 1
- Liquids Throughput Profile
- Throughput: Table 1
- Economic analysis: Table 1
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Pump Station 1 Schematic
- Valdez Marine Terminal Schematic
- Costs: Table 1
- Costs: Table 2
What's included
This report contains:
Other reports you may be interested in
Gassled-Vesterled
The Vesterled system is a link between the Norwegian gas pipeline system and the UK gas market.
$2,150Tyra - NOGAT Pipeline
In 2003, the Danish Underground Consortium (DUC) companies and DONG Energy (now Orsted) agreed to build a pipeline linking the Tyra ...
$2,150Ek-Balam
The Ek and Balam fields are located offshore in the Bay of Campeche, 95 kilometres northeast of Ciudad del Carmen. The fields were part ...
$3,100