Eni NGT hub
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
-
Summary
- K/9ab
- K/9c
- K/12
- L/10-L/11a
- Key Issues
- K/9ab
- K/9c
- K/12
-
L/10-L/11a
- K/9ab
- K/9C
- K/12
- L/10-L/11a
- Capital costs
- K/9ab
- K/9C
- K/12 and K/12-G
- L/10-L/11A and L/10-M
- Operating costs
- 12 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index mapEni NGT hub mapParticipation
-
Hydrocarbon and reservoir qualityDiscovery summaryReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)K/9AB production profileK/9C production profileK/12 production profileK/12-G production profile
- 65 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Tyra Area
Tyra is the largest offshore oil and gas development in Denmark. The infrastructure acts as a key offshore gas processing hub and is ...
$3,720Troldhaugen
The Troldhaugen field was discovered in 2009, on the southern side of the Edvard Grieg field, in Northern North Sea.
$3,720Roar
The Roar gas field in Denmark is a satellite of the larger Tyra gas hub and is located around 10 kilometres to the southeast. Gas and ...
$3,720