Asset report

Transmed Pipeline

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Transmed pipeline system transports gas from the Hassi R'Mel field onshore Algeria across Tunisia and the Mediterranean to Sicily and onwards to the Italian mainland. Transmed forms the back bone of the Italian gas transmission system. It is 1 575 kilometres long and terminates at Minerbio near Bologna in the Po Valley. The first phase of the pipeline system came onstream in 1983 with an initial annual capacity of 16 bcm (1 550 mmcfd). A second parallel pipeline to expand the ...

What's included

This report contains

  • Document

    Transmed Pipeline

    PDF 683.76 KB

  • Document

    Transmed Pipeline

    XLS 94.50 KB

  • Document

    Transmed Pipeline

    ZIP 750.39 KB

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
    • Background
    • Pipeline Routing
    • Phase I
    • Phase II
    • Phase III
  • Throughput
  • Costs
    • SNAM
    • Enel
    • Edison Gas
    • Tunisia
    • Others

Tables and charts

This report includes 3 images and tables including:

Images

  • Map

Tables

  • Key facts: Table 1
  • Participation: Table 1

You may be interested in

Asset report

Johan Castberg

Asset report

Skarv Area

Asset report

Bruce Area

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898