Asset Report

Trent and Tyne

Get this report

$3,100

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Trent and Tyne gas fields are located in the Southern Gas Basin, around 160 kilometres north of the Bacton terminal. The fields were developed in parallel via a not normally manned (NNM) platform on each field. The Tyne field includes the Tyne North, Tyne South and Tyne West accumulations. A Mobile Offshore Applications Barge (MOAB) was installed on the Trent field in 2005. The MOAB is bridge-linked to the Trent platform, providing compression facilities for Trent and Tyne, as well as ...

Table of contents

  • Key facts
    • Summary
    • Key issues
      • Tyne platform removed
      • Cessation of production at Trent
      • Tie-back revenue
  • Location maps
  • Participation
  • Geology
  • Well data
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
    • Capital costs
      • Trent
      • Tyne
    • Decommissioning costs
    • Operating costs
      • Emissions Trading Scheme (ETS)
      • Trent
      • Tyne
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Gas price
    • Carbon price
    • Fiscal terms
    • Global Economic Model (GEM) file
    • Cash Flow

Tables and charts

This report includes 29 images and tables including:

  • Key facts: Table 1
  • Index map
  • Trent and Tyne map
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Well data: Table 2
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production profile
  • Development: Table 1
  • Infrastructure: Table 1
  • Costs: Table 5
  • Cash flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Present Value Price Sensitivities
  • Cash flow (£ millions)
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Costs: Table 6
  • Costs: Table 7

What's included

This report contains:

  • Document

    Trent and Tyne

    PDF 4.59 MB

  • Document

    Trent and Tyne

    XLS 1.09 MB