Trestakk
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Reserves lower than expected but new infill targets are being evaluated
- Gas blowdown phase expected to start in 2028
- Unitisation
- Drilling
- Subsea
- Capital costs
- Decommissioning costs
-
Operating costs
- Transportation costs
- Emissions taxes
- Cash flow
- Fiscal terms
- Global Economic Model (GEM) file
- Cash Flow
- 2 more item(s)...
Tables and charts
This report includes the following images and tables:
- Participation
- Field characteristics
- Reserves (2P) at 01/01/2026
- Production (2019-2025)
- Production profile
- Pipeline summary
- Capital Costs Pre-2016 to 2024 (NKr million)
- Capital Costs 2033 to 2034 (NKr million)
- Cash Flow (US$)
- 12 more item(s)...
What's included
This report contains: