Troll
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
-
Summary
- Phase 1:
- Phase 2:
- Phase 3:
-
Key Issues
- Gas production managed by a permit - 2023/2024 permit increased to 42 bcm
- Additional gas recovery projects are under consideration
- Oil production to cease in 2030
- Decarbonisation - Troll B & C electrification sanctioned in April 2021
- Troll C expected to remain in place after cessation
- The Ringvei Vest and Fram Sør developments offer potential third-party revenue
- Trollvind project postponed indefinitely
-
Historical unitisation
- Recent and upcoming exploration
- Gas
-
Emissions
- Key Development Metrics
- Phase 1
- Platform
- Wells
- Troll East North
- Phase 2
- Platforms
- Subsea
- 6 more item(s)...
- Capital Costs - Phase 1 and 2
- Capital Costs - Phase 3
- Phase 3 (including hot tap to Kvitebjorn) and Phase 3 Step 2
- Decommissioning
-
Operating Costs
- Emissions costs
- Power costs
- Phase 3 operating costs
-
Tariff Receipts
- Gas
- Oil
- Cash flow
- 5 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Field CharacteristicsField Characteristics
-
Capital Costs Pre-2016 to 2024 (NKr million)Capital Costs 2018 to 2024 (NKr million)Capital Costs 2063 to 2064 (NKr million)Operating Costs 2025 to 2034 (NKr million)Operating Costs 2025 to 2034 (NKr million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of Revenues
- 19 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Troll Oil Pipelines
The Troll oil pipeline development (Troll Oljerør) was initiated to provide an export solution for Troll oil production.
$2,580Fram Norway
The Fram area consists of a phased development of the Fram H Vest, Fram C Vest and Fram F Øst fields.
$3,720Fram Sør
The Fram Sør fields are north of Troll in the Northern North Sea. The subsea development will be tied back to the Troll C platform.
$3,720