Asset Report
Tune
Report summary
The Tune gas/condensate field is located to the west of the Oseberg field complex. The field has been developed as a subsea satellite tied back to the processing facilities on the Oseberg D platform. Production from phase III (Tune South) started in July 2009 via a single well tied back to Oseberg D via the Tune template.Condensate and NGLs are transported to the Sture terminal through the Oseberg Transport System. Gas is injected into Oseberg and exported via Gassled.
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
-
Development
- Potential life extension
- Drilling
- Infrastructure
-
Costs
- Capital Costs
- Operating Costs
- Sales contracts
- Fiscal and regulatory
-
Economic assumptions
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Carbon price
- Exchange rate
- Fiscal terms
- Global Economic Model (GEM) file
-
Economic analysis
- Cash Flow
Tables and charts
This report includes 23 images and tables including:
- Key facts: Table 1
- Index map
- Tune map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Production Profile
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Cash Flow (US$ million)
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Present Value Price Sensitivities
- Cash Flow (NKr million)
- Economic analysis: Table 5
- Economic analysis: Table 6
What's included
This report contains:
Other reports you may be interested in
Asset Report
Gassled-Oseberg Gas Transport
The Oseberg Gas Transport (OGT) Pipeline links the Oseberg-D gas processing platform with the Heimdal riser platform.
$2,150
Asset Report
Vestprosess
The Vestprosess system includes the NGLs pipeline from the Kollsnes gas terminal and the Sture oil terminal to the Mongstad refinery.
$2,150