Ula
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Operator submits removal program for Ula and Tambar hub
- Remaining reserves downgrade and accelerated field shut down
- Facilities
-
Secondary recovery
- Potential development of the Triassic
- WAG injection project
- Infill drilling phase 2
- The Ula future project
- Capital costs
- Decommissioning costs
-
Operating costs
- Oil
- Gas
- Cash Flow
- Fiscal Terms
- Global Economic Model (GEM) file
- Cash Flow
- Cash Flow (US$ million)
- 1 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Platform summaryCapital Costs 2015 to 2024 (NKr million)Capital Costs 2029 to 2034 (NKr million)
-
Operating Costs 2025 to 2028 (NKr million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining Present Value Price SensitivitiesCash Flow (Local Currency)
- 12 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Ula Pipeline
The Ula oil pipeline was originally constructed to transport oil/LPG from the Ula field to the Ekofisk centre. ...
$2,580Blane UK
The Blane oil field straddles the UK/Norway median line and was developed as a subsea tie-back to the Ula platform, which lies 34 ...
$3,720Blane Norway
The Blane oil field straddles the UK/Norway median line and has been developed as a subsea tie-back to the Ula platform.
$3,720