Asset Report

Ursa (MC 810)

Get this report*

$3,100

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Ursa (MC 810) is a large oil and gas field located in the Mississippi Canyon protraction area of Central Gulf of Mexico. The development incorporates a purpose-built TLP with dry-tree wells and separate oil (Ursa Oil Pipeline) and gas (Ursa Gas Gathering) pipeline systems. When production commenced in March 1999, Ursa surpassed Ram-Powell to become the deepest producing TLP in the Gulf of Mexico. Big Foot is now the deepest TLP in GoM.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • MC 809 and 853
    • MC 808
    • MC 810 and 854
    • Unitisation
    • Royalty Overrides
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
    • Platform
    • Drilling
    • Satellites
  • Infrastructure
    • Exploration and Appraisal Costs
    • Capital Costs
    • Operating Costs
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Gas price
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 22 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Field Map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Infrastructure: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining Present Value Price Sensitivities
  • Development: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

What's included

This report contains:

  • Document

    Ursa (MC 810)

    PDF 5.51 MB

  • Document

    Ursa (MC 810)

    XLS 668.00 KB