Asset Report

Waitsia

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Waitsia is an onshore conventional gas field in the Perth Basin. It was discovered in 2014 and appraised in 2015. The field was brought onstream through the existing Xyris gas plant in August 2016. Waitsia Stage 2 was sanctioned in December 2020 including a new-build 250 TJ/d (245 mmcfd) gas plant in addition to increasing the capacity of the Xyris gas plant to 30 TJ/d (28 mmcfd). Waitsia gas will be delivered to the Bunbury-to-Dampier pipeline where AGIG, the pipeline operator, will backhaul the gas to the North West Shelf for LNG export. Up to 7.5 MMt of LNG is destined for export from Waitsia.

Table of contents

  • Summary
    • Key development metrics
    • Stage 2
    • Wells
    • Processing facility
    • Pipelines
    • Additional drilling
    • Wells
    • Capital Costs
    • 6 more item(s)...
  • Royalty
  • Corporate income tax
  • Cashflow
  • Global Economic Model (GEM) file
  • Cash Flow

Tables and charts

This report includes the following images and tables:

  • Index Map
  • Waitsia Detail Map
  • Participation
  • Reserves (2P) at 01/01/2025
  • Production (2015-2024)
  • Production Profile
  • Cash Flow (US$)
  • PV Table (US$)
  • Summary Table (US$)
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • 7 more item(s)...

What's included

This report contains:

  • Document

    Waitsia

    XLS 711.50 KB

  • Document

    Waitsia

    PDF 2.22 MB