Asset Report

West Esh El Mallaha (WEEM)

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

02 January 2018

West Esh El Mallaha (WEEM)

Report summary

The West Esh El Mallaha fields are located in the Eastern Desert, eight kilometres from Hurghada. Coplex made the first two discoveries on the block, Rabeh and Rabeh East, in 1997. First production was achieved in 1998 from temporary production facilities and the oil was exported by truck in limited quantities. LUKOIL acquired all outstanding equity in the block from Bitech and Naftex in 2002. Subsequently, it initiated an extensive facility upgrade and development drilling programme.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Infrastructure
    • Capital Costs
    • Abandonment Costs
    • Operating Costs
    • Cost/Profit Oil
    • WEEM Extension Area
    • Cost/Profit Gas
    • Bonuses
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) File
  • Economic analysis

Tables and charts

This report includes 35 images and tables including:

  • Key facts: Table 1
  • Index Map
  • West Esh El Mallaha (WEEM) Map
  • Participation: Table 1
  • Participation: Table 2
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile WEEM
  • Production Profile WEEM Extension
  • Infrastructure: Table 1
  • Costs: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities
  • Economic analysis: Table 4
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Fiscal and regulatory: Table 3

What's included

This report contains:

  • Document

    West Esh El Mallaha (WEEM)

    PDF 6.36 MB

  • Document

    West Esh El Mallaha (WEEM)

    XLS 893.00 KB

  • Document

    West Esh El Mallaha (WEEM)

    ZIP 7.11 MB

Other reports you may be interested in

Browse reports by Industry Sector