Asset Report
West Esh El Mallaha (WEEM)
This report is currently unavailable
Report summary
The West Esh El Mallaha fields are located in the Eastern Desert, eight kilometres from Hurghada. Coplex made the first two discoveries on the block, Rabeh and Rabeh East, in 1997. First production was achieved in 1998 from temporary production facilities and the oil was exported by truck in limited quantities. LUKOIL acquired all outstanding equity in the block from Bitech and Naftex in 2002. Subsequently, it initiated an extensive facility upgrade and development drilling programme.
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Well data
- Reserves and resources
- Production
- Development
- Infrastructure
-
Costs
- Exploration Costs
- Capital Costs
- Abandonment Costs
- Operating Costs
-
Fiscal and regulatory
-
WEEM Area
- Cost/Profit Oil
- Bonuses
- WEEM Extension Area
-
WEEM Area
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Global Economic Model (GEM) File
-
Economic analysis
- Cash Flow
Tables and charts
This report includes 35 images and tables including:
- Key facts: Table 1
- Index Map
- West Esh El Mallaha (WEEM) Map
- Participation: Table 1
- Participation: Table 2
- Geology: Table 1
- Geology: Table 2
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Production Profile WEEM
- Production Profile WEEM Extension
- Infrastructure: Table 1
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- WEEM Area
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining PV Price Sensitivities
- WEEM Extension Area
- Economic analysis: Table 5
- Economic analysis: Table 6
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining PV Price Sensitivities
- Fiscal and regulatory: Table 1
- Fiscal and regulatory: Table 2
What's included
This report contains:
Other reports you may be interested in
Asset Report
West Wits (Doornkop and Kusasalethu) gold mine
A detailed analysis of the combined Doornkop and Kusasalethu gold mines.
$2,250
Asset Report
North West Operations (Hartebeestfontein & Buffelsfontein) (Closed) gold mine
A detailed analysis of the North West Operations (Hartebeestfontein & Buffelsfontein) gold mine.
$2,250
Asset Report
Touissit (closed) zinc mine
A detailed analysis of the Touissit (Closed) zinc mine.
$2,250