Asset Report

West Esh El Mallaha (WEEM)

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The West Esh El Mallaha fields are located in the Eastern Desert, eight kilometres from Hurghada. Coplex made the first two discoveries on the block, Rabeh and Rabeh East, in 1997. First production was achieved in 1998 from temporary production facilities and the oil was exported by truck in limited quantities. LUKOIL acquired all outstanding equity in the block from Bitech and Naftex in 2002. Subsequently, it initiated an extensive facility upgrade and development drilling programme.

Table of contents

Tables and charts

This report includes 35 images and tables including:

  • Key facts: Table 1
  • Index Map
  • West Esh El Mallaha (WEEM) Map
  • Participation: Table 1
  • Participation: Table 2
  • Geology: Table 1
  • Geology: Table 2
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile WEEM
  • Production Profile WEEM Extension
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • WEEM Area
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining PV Price Sensitivities
  • WEEM Extension Area
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining PV Price Sensitivities
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2

What's included

This report contains:

  • Document

    West Esh El Mallaha (WEEM)

    PDF 7.04 MB