Asset Report

West Madura and Poleng

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The West Madura PSC comprises a group of small fields offshore Java, while Poleng is a single oil and gas accumulation. PERTAMINA operates both West Madura and Poleng, although through two different subsidiaries. PERTAMINA Hulu Energy (PHE) operates West Madura, while PERTAMINA EP (PEP) is the operator of the adjoining Poleng. Both developments share production facilities and are supported by an onshore base and gas receiving facilities located in Gresik, East Java.The West Madura PSC began production in 1985, followed by Poleng in 1998. Gas from both developments is sold jointly into the East Java market, while crude is shipped to the Balikpapan refinery. This report includes an overview of trends and activities in the asset with analysis on cost, production, cashflow and fiscal terms.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Unitisation
  • Well data
    • Recent Exploration
    • Historical Exploration
    • West Madura
      • Poleng
  • Reserves and resources
    • Emissions
    • Recent development
      • West Madura
      • Poleng
    • Key development metrics
      • West Madura
      • KE-2 and KE-30
      • KE-5 and KE-6
      • KE-40
      • KE-23
      • KE-32 and KE-38
      • KE-39 and KE-54
      • KE-12 and KE-24
    • Poleng
      • Wells
      • Platform
      • Supplier information
      • Pipeline
  • Infrastructure
    • Exploration Costs
    • Capital Costs
      • West Madura PSC
      • Poleng
    • Operating Costs
      • West Madura
      • Poleng
    • PLN
    • Other GSAs
  • 3 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index Map
  • West Madura PSC/Poleng Map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • West Madura PSC Production Profile
  • Poleng Production Profile
  • Infrastructure: Table 1
  • 23 more item(s)...

What's included

This report contains:

  • Document

    West Madura and Poleng

    PDF 8.00 MB

  • Document

    West Madura and Poleng

    XLS 1.04 MB