Asset report

West Madura and Poleng

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The West Madura PSC comprises a group of small field developments offshore Java while Poleng is a single oil and gas accumulation. PERTAMINA operates both West Madura and Poleng although through two different subsidiaries. PERTAMINA Hulu Energy (PHE) operates West Madura while PERTAMINA EP (PEP) is the operator of the adjoining Poleng. Both developments share production facilities and are supported by an onshore base and gas receiving facilities located in Gresik East Java.The West ...

What's included

This report contains

  • Document

    West Madura and Poleng

    PDF 683.21 KB

  • Document

    West Madura and Poleng

    XLS 915.00 KB

  • Document

    West Madura and Poleng

    ZIP 1.44 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
  • Sales contracts
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 36 images and tables including:

Images

  • Index Map
  • West Madura PSC/Poleng TAC Map
  • West Madura PSC Production Profile
  • Poleng TAC Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining Present Value Price Sensitivities
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Infrastructure: Table 1
  • Production: Table 1
  • Production: Table 2
  • Costs: Table 1
  • Costs: Table 6
  • Sales contracts: Table 1
  • Sales contracts: Table 2
  • West Madura PSC
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Poleng TAC
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Costs: Table 5

You may be interested in

Asset report

Tuban (PPEJ)

Asset report

South East Sumatra

Asset report

Rimau

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898