Wood Mackenzie Presentations at Africa Oil Week 2019
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Vestprosess
The Vestprosess system includes the NGLs pipeline from the Kollsnes gas terminal and the Sture oil terminal to the Mongstad refinery.
$2,580Gassled-Zeepipe Terminal Zeebrugge
The Zeebrugge terminal receives gas, via Zeepipe, from fields such as Troll and Sleipner.
$2,580Indonesia upstream summary slides
A slide-pack of the key issues in Indonesia to complement our more detailed upstream summary
$5,700