Xinjiang (Sinopec)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Capital costs
-
Operating costs
- Special Oil Levy (Windfall Profit Tax)
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Index Map
- Detail Map
- Participation
- Reserves (2P) at 01/01/2025
- Production (2015-2024)
- Production Profile
- Capital Costs Pre-2016 to 2024 (US$ million)
- Operating Costs 2024 to 2033 (US$ million)
- Annual Gas Prices
- Cash Flow (US$)
- PV Table (US$)
- 5 more item(s)...
What's included
This report contains:
Other reports you may be interested in
West East Gas Pipeline III
West-East Pipeline III (WEP III) is connected to line C of the Central Asia-China Gas Pipeline.
$2,580Ordos Basin (Sinopec)
Sinopec holds around 25,000 square kilometres of acreage in the Ordos basin, mainly in the north and southwest parts of the basin.
$3,720Sichuan Basin (Remaining Sinopec)
This asset analysis covers Sinopec's gas production in Sichuan, excluding Puguang and Yuanba.
$3,720