Asset Report
Yam Tethys Project
Report summary
The Yam Tethys Project comprises three gas fields located approximately 20 kilometres offshore Israel in the Eastern Mediterranean: Mari B, Noa and Pinnacles. Production at Mari B commenced in 2004, four years after its discovery. Noa and Pinnacles are smaller satellite fields and were tied back to the main facilities at Mari B. The fields produced for a short period of time in 2012 and 2013, in response to an increase in demand and supply shortfalls from Egypt. Mari B continues to produce at low volumes.
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
-
Geology
- Offshore
- Levantine Basin
- Well data
- Exploration
- Reserves and resources
- Production
-
Development
- Historical Development
- Noa and Pinnacles
- Gas Storage Proposal
- Abandonment
- Infrastructure
-
Costs
- Capital costs
- Sales contracts
-
Fiscal and regulatory
-
Concession agreement
- Contract term
- State equity participation
- Bonuses, rentals and fees
- Signature bonuses
- Production bonuses
- Training fees
- Other fees and land rentals
- Indirect taxes
- Import duties
- Excise duty
- Royalty and other production taxes
- Profits levy
- Royalty
- Domestic Market Obligation (DMO)
- Contractor revenue entitlement
- Corporate (or Petroleum) income tax
- Tax rate
- Taxable Income
- Depreciation
- Loss carry forward
-
Concession agreement
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Global Economic Model (GEM) File
- Economic analysis
Tables and charts
This report includes 18 images and tables including:
- Key facts: Table 1
- Index Map
- Detail Map
- Participation: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Production Profile
- Infrastructure: Table 1
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Geology: Table 1
- Costs: Table 1
What's included
This report contains:
Other reports you may be interested in
Asset Report
Tamar
Tamar is a dry gas field located offshore Israel. It was brought onstream in 2013 and mainly supplies the domestic market.
$5,750
Asset Report
White Rose Project
The White Rose and satellite extensions are located 350 kilometres southeast of St. John's, Newfoundland and Labrador in the Jeanne ...
$3,100
Asset Report
Mehdiabad zinc mine project
A detailed analysis of the Mehdiabad zinc mine project.
$2,250