Asset Report
Yucal-Placer
This report is currently unavailable
Report summary
Yucal-Placer is a large dry gas field that is strategically located close to markets in the Caracas area. The field was discovered in 1947 and brought onstream in 1950. Between then and 1989, it produced 150 bcf of gas before being shut in to make way for cheaper gas discovered in the Anaco area, farther to the east.Faced with a countrywide gas deficit, PDVSA tendered the field in 2001. This tender was part of a gas licensing round that also included gas-prone exploration acreage across ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
- Development
- Infrastructure
- Costs
- Sales contracts
-
Fiscal and regulatory
- Royalty
- Corporate income taxes
- Windfall taxes
-
Economic assumptions
- Cash flow
- Discount rate and date
- Oil price
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes 25 images and tables including:
- Key facts: Table 1
- Index Map
- Detail Map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Exploration: Table 1
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Production: Table 1
- Production: Table 2
- Production Profile
- Infrastructure: Table 1
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Sales contracts: Table 1
- Cash Flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining Present Value Price Sensitivities
What's included
This report contains:
Other reports you may be interested in
Asset Report
Vizcachitas copper mine project
A detailed analysis of the Vizcachitas copper mine project.
$2,250
Asset Report
Can Can (Closed) gold mine
A detailed analysis of the Can Can (Closed) gold mine.
$2,250
Asset Report
São Vicente (Closed) gold mine
A detailed production, commercial and competitive analysis of the São Vicente gold mine.
$2,250