Zenith Energy-operated fields
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Torrente Cigno block
- S. Andrea block
-
Masseria Grottavecchia, Masseria Petrilli and S. Teodoro II blocks
- Key development metrics
- Liquids
- Gas
- Electricity
- Capital costs
-
Operating costs
- Electricity
- Gas price
- Global Economic Model (GEM) file
- 1 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Zenith Energy-operated fields mapWeighted average participationParticipation at key fields
-
Field hydrocarbon and reservoir qualityKey discovery summaryReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2014-2023)Zenith Energy-operated fields production profileCapital Costs Pre-2015 to 2023 (US$ million)Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Energean-operated Greece fields
Energean operates Greece's only producing upstream project, the offshore Prinos Area oil fields, and the now ceased South Kavala ...
$3,720Spain onstream fields
This analysis covers Spain's two remaining onstream developments: El Romeral and Viura.The El Romeral licence is operated by Tarba ...
$3,720Energean-operated Italy fields
Energean operates about 40 oil and gas fields in Italy, located onshore and offshore. In 2023, gross production averaged more than ...
$3,720