Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Most popular reports
Metals costs Insights reports
Ziar Nad Hronom aluminium smelter
The prebake lines replaced a Søderberg facility, which ceased production in 1996. Wood Mackenzie’s asset reports are built from the bottom up, inco...
Taishet aluminium smelter
Taishet will be configured in two lines, both with two rooms containing 176 cells per room (a total of 704 cells), and will utilise RA-400 technolo...
Decar nickel project
A large open pit recovering nickel as a nickel-iron awaruite concentrate with minimal sulphur content. Wood Mackenzie’s asset reports are built fro...
Laterrière aluminium smelter
Laterrière was built in part to replace 200kt/a of Søderberg capacity closed at the Arvida (Jonquière) complex. Wood Mackenzie’s asset reports are ...
Jonquière (Arvida) aluminium smelter
In May 2013, RTA announced that it would push the closure of the smelter from end 2014 to end 2016. Wood Mackenzie’s asset reports are built from t...
Podgorica aluminium smelter
KAP has not operated at full capacity of 120ktpa since 2007. The smelter is comprised of two lines each housing 264 cells of Pechiney design. The c...
Viewing page 23 of 449