Baiyin North West zinc smelter
Construction of the Baiyin North West Zinc Smelter (BNWZS) commenced in the late 1980s and it was commissioned in 1992. The BNWZS had a nominal cap...
South Flank iron ore mine
BHP's South Flank mine started production in May 2021. The mine was completed on budget with a total capital intensity of US$45 per tonne. The Sout...
Luoping zinc smelter
The Luoping zinc smelter was built in 1995 with a capacity of 12kt/a slab zinc and has expanded over the years to the current 120kt/a capacity. How...
Hikoshima zinc smelter
The Hikoshima smelter, located in Shimonoseki, Japan, uses roast, leach, electrowin technology to produce slab zinc. leach residue are sent to othe...
Torreon zinc smelter
The zinc smelter was commissioned in 1973 with a capacity of 100kt/a, the original earlier site operation comprising a lead-silver smelting plant o...
San Luis Potosi zinc smelter
The San Luis Potosi smelter was commissioned in November 1982 at a cost of US$200M. The planned capacity was 113kt/a zinc but as the roasting capac...