Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Clarksville zinc smelter
The Clarksville electrolytic zinc smelter was built on a greenfield site and commissioned in 1979. The design capacity was for a production of 81.6...
Taifeng zinc smelter
The Taifeng smelter was commissioned in 2002 with a capacity of 45kt/a. In 2008, construction began on a 60kt/a expansion of the smelter to raise t...
Hualin zinc smelter
Hulian zinc smelter was originally found as Wenshan Dulong Tin Mine in 1958. In May 2016, after restructured by Yunnan Tin Co.Ltd, Hualian construc...
Baoji (ISF) zinc smelter
In late-2003 construction started on a greenfield site, 27km North of Baoji, of a 100kt/a zinc-lead ISF smelter with a design capacity of 67kt/a zi...
Chifeng zinc smelter
The original smelter at Chifeng had a capacity of 21kt/a and was commissioned in 1995. This was expanded to 50kt/a in 2003, with the addition of a ...
Sheba Ridge nickel project
The Sheba's Ridge Project is a large-scale, undeveloped PGM-Nickel-Copper asset located in South Africa. It is configured as a proposed large-scale...
Viewing page 57 of 449