Asset Report
Adaro MetCoal Stage 1 coal mine
Report summary
Adaro MetCoal Stage 1 is a metallurgical coal mine located in the Murung Raya regency in Central Kalimantan. The mine includes metallurgical coal mining areas of Haju (Lahai concession) and Lampunut (Maruwai concession). The two concessions within Adaro MetCoal Stage 1 span a total of 668 square kilometres. Adaro MetCoal Stage 1 is part of the greater Adaro MetCoal Project which also includes the nearby Pari, Sumber Barito, Kalteng, Juloi, and Ratah concessions.
Table of contents
- Summary
-
Key Issues
- Production
Tables and charts
This report includes 14 images and tables including:
- Participants (%)
- Coal seams
- Marketable reserves
- Production
- Production
- Operations
- Infrastructure
- Cash costs (US$/tonne)
- Cash costs (US$/tonne)
- Capital costs (US$ million)
- Coal quality
- Economic Assumptions
What's included
This report contains:
Other reports you may be interested in
23 October 2020
Adaro MetCoal Stage 2 coal mine
Asset Report
Adaro MetCoal Stage 2 coal mine
A detailed analysis of the Adaro MetCoal Stage 2 coal mine.
$2,55010 June 2020
Ironbark No.1 coal mine
Asset Report
Ironbark No.1 coal mine
Detailed asset level data for the Ironbark No 1 coal project.
$2,55010 April 2018
Adaro and EMR diversify into Australian metallurgical coal with US$2.25 billion Kestrel acquisition
Insight
Adaro and EMR diversify into Australian metallurgical coal with US$2.25 billion Kestrel acquisition
EMR and Adaro pay premium in a bid to cut costs
$1,100