Asset Report

Adaro MetCoal Stage 1 coal mine

Get this report

$1,500

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

22 September 2017

Adaro MetCoal Stage 1 coal mine

Report summary

Adaro MetCoal Stage 1 is a metallurgical coal mine located in the Murung Raya regency in Central Kalimantan. The mine includes metallurgical coal mining areas of Haju (Lahai concession) and Lampunut (Maruwai concession). The two concessions within Adaro MetCoal Stage 1 span a total of 668 square kilometres. Adaro MetCoal Stage 1 is part of the greater Adaro MetCoal Project which also includes the nearby Pari, Sumber Barito, Kalteng, Juloi, and Ratah concessions.

Table of contents

  • Key facts
    • Summary
    • Key Issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
    • Production
  • Operations
  • Infrastructure
  • Costs
  • Sales contracts
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

  • Key facts: Table 1
  • Location maps: Image 1
  • Participants (%)
  • Coal seams
  • Marketable reserves
  • Operations
  • Infrastructure
  • Cash costs (US$/tonne)
  • Cash costs (US$/tonne)
  • Capital costs (US$ million)
  • Coal quality
  • Economic Assumptions
  • Production

What's included

This report contains:

  • Document

    Asset IndoMet Stage 1.xls

    XLS 219.50 KB

  • Document

    IndoMet Stage 1-Indonesia-BASE.XLS

    XLS 560.00 KB

  • Document

    Asset Adaro MetCoal Stage 1.xls

    XLS 220.50 KB

  • Document

    Adaro MetCoal Stage 1-Indonesia-BASE.XLS

    XLS 574.50 KB

  • Document

    Adaro MetCoal Stage 1 coal mine

    PDF 428.25 KB

  • Document

    Adaro MetCoal Stage 1 coal mine

    ZIP 1.37 MB

Other reports you may be interested in

Browse reports by Industry Sector