Asset Report

Ashton coal mine

Get this report

$2,550

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Ashton coal mine is located in the Hunter Valley of New South Wales, 15 kilometres north-west of Singleton. We cover the underground mine at Ashton in a separate asset report. The proposed re-start of operations at the south-east open cut is contained within mining leases MLA 394 and MLA 351. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions

Tables and charts

This report includes 15 images and tables including:

  • Ashton Emission Intensity Quartile ranking – total global production - saleable tonnes
  • Detailed map
  • Participation
  • Coal seams
  • Marketable reserves
  • Production
  • Production
  • Operations
  • Infrastructure
  • Cash costs
  • Cash costs
  • Capital costs
  • Product quality
  • Economic assumptions

What's included

This report contains:

  • Document

    Ashton coal mine

    PDF 1.38 MB

  • Document

    Ashton coal mine

    ZIP 1.12 MB

  • Document

    Asset_Ashton.xlsx

    XLSX 182.67 KB

  • Document

    Ashton-LIVE_Australia-BASE.XLS

    XLS 624.00 KB