Asset Report

Insani Bara Perkasa coal mine

Get this report

$2,550

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Insani Bara Perkasa is a sub-bituminous mine located over eight largely non-adjoining coal blocks near the city of Samarinda, East Kalimantan. The Insani Bara Perkasa concession area covers a total area of 245 square kilometres. The mine operates under a third generation coal contract of work (CCoW) that was awarded in 1997 and expires in 2036. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues

Tables and charts

This report includes 13 images and tables including:

  • Detailed map
  • Participants (%)
  • Coal seams
  • Marketable reserves
  • Production
  • Production
  • Operations
  • Infrastructure
  • Cash costs (US$/tonne)
  • Cash costs
  • Capital costs (US$ million)
  • Coal quality
  • Economic assumptions

What's included

This report contains:

  • Document

    Insani Bara Perkasa coal mine

    PDF 1.20 MB

  • Document

    Insani Bara Perkasa coal mine

    ZIP 1.19 MB

  • Document

    Insani Bara Perkasa LIVE Indonesia BASE

    XLS 729.50 KB

  • Document

    Asset_Insani Bara Perkasa.xlsx

    XLSX 155.92 KB