Asset Report
Similoa - El Corozo coal mines
Report summary
The Rincón Hondo, El Descanso Sur, and Similoa reserve areas are being developed as replacements for the Pribbenow (La Loma) reserves. Drummond has received an extension to the lease of the Pribbenow concession to 2039 and intends to integrate the operation with nearby El Descanso Sur, Rincón-Hondo, and Similoa reserve areas. However, we currently keep separate records of these reserves in our research and show the original Pribbenow operation depleting reserves by 2024.
Table of contents
- Summary
- Key issues
Tables and charts
This report includes 13 images and tables including:
- Detailed map
- Participation
- Coal seams
- Marketable reserves
- Production
- Production
- Operations
- Infrastructure
- Cash costs
- Cash costs
- Capital costs
- Product quality
- Economic assumptions
What's included
This report contains:
Other reports you may be interested in
18 May 2023
Wilton coal mine
Asset Report
Wilton coal mine
Detailed asset level data for this mine or project.
$2,55018 May 2023
Fairhill coal mine
Asset Report
Fairhill coal mine
Detailed asset level data for this mine or project.
$2,55026 May 2023
Coal asset report - Stratford - May 2023
Asset Report
Coal asset report - Stratford - May 2023
Detailed asset level data for this mine or project.
$2,550