Vietnam LNG long-term outlook 2019
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Energy policy
-
Regasification terminals
- Under Construction
- Vung Tau regasification terminal
- Proposed terminals
- Thi Vai regasification terminal
- Son My regasification terminal
- Bac Lieu regasification terminal
- Quang Nam regasification terminal
- Ca Na regasification terminal
- 4 more item(s)...
- Downside risks
- Upside risks
Tables and charts
This report includes the following images and tables:
-
Proposed LNG terminals
What's included
This report contains:
Other reports you may be interested in
Block 09-3/12 (Ca Tam)
Block 09-3/12 is located in the Cuu Long Basin and contains the Ca Tam field. Production from the field started in January 2019.
$3,720Block 15-2/01 (Hai Su Trang/Hai Su Den)
The Hai Su Trang and Hai Su Den fields (HST/HSD) were discovered within Block 15-2/01 on the Cuu Long Basin.
$3,720China distributed solar market outlook 2025
a comprehensive analysis of market trends, near-term dynamics and future perspectives of DG solar in China
$5,990