Vietnam LNG long-term outlook 2019
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Energy policy
- 
        
            Regasification terminals
        
        - Under Construction
- Vung Tau regasification terminal
- Proposed terminals
- Thi Vai regasification terminal
- Son My regasification terminal
- Bac Lieu regasification terminal
- Quang Nam regasification terminal
- Ca Na regasification terminal
- 4 more item(s)...
 
- Downside risks
- Upside risks
Tables and charts
This report includes the following images and tables:
- Proposed LNG terminals
What's included
This report contains:
Other reports you may be interested in
China economic focus October 2025: outlook for the 15th Five-Year Plan
China faces challenges in the next five years to achieving its long-term 2025 growth target.
$1,150Bayu-Undan (LNG) (Ceased)
Bayu-Undan is a large gas/condensate field that straddles the TL-SO-T 19-12 and TL-SO-T 19-13 blocks. Production ceased in June 2025.
$6,900Block 09-3/12 (Ca Tam)
Block 09-3/12 is located in the Cuu Long Basin and contains the Ca Tam field. Production from the field started in January 2019...
$3,720 
         
         
         
         
         
         
     
     
     
     
     
     
     
     
    