Vietnam LNG long-term outlook 2019
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Energy policy
-
Regasification terminals
- Under Construction
- Vung Tau regasification terminal
- Proposed terminals
- Thi Vai regasification terminal
- Son My regasification terminal
- Bac Lieu regasification terminal
- Quang Nam regasification terminal
- Ca Na regasification terminal
- 4 more item(s)...
- Downside risks
- Upside risks
Tables and charts
This report includes the following images and tables:
- Proposed LNG terminals
What's included
This report contains:
Other reports you may be interested in
How would a delayed energy transition in North America impact the natural gas market?
North American gas market outlook in a delayed energy transition scenario.
$950Bayu-Undan (LNG) (Ceased)
Bayu-Undan is a large gas/condensate field that straddles the TL-SO-T 19-12 and TL-SO-T 19-13 blocks. Production ceased in June 2025.
$6,900Datang aluminium smelter
A detailed analysis of the Datang aluminium smelter.
$2,250