Asset Report

Al-Zour LNG - LNG regas terminal

From

$700.00

You can pay by card or invoice

From

$700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Plans to import on a longer-term basis were disclosed as soon as 2010, as Kuwait started to import LNG via its FSRU. The scope and size of the onshore project have evolved over the years. KNPC awarded the pre-FEED and FEED (Front End Engineering and Design) study to a subsidiary of Foster Wheeler and a local partner in March 2014. The terminal is located at Al-Zour, 90 kilometres south of Kuwait City. More than ten ...

What's included

This report contains

  • Document

    Al-Zour LNG - LNG regas terminal

    PDF 333.36 KB

Table of contents

  • Key facts
  • Location maps
  • Country overview
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 4 images and tables including:

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3

Images

  • Map

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800