Asset Report

Aliaga LNG - LNG regas terminal

From

$700.00

You can pay by card or invoice

From

$700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Turkey's second regasification terminal, located at Aliaga, was completed in 2001. However, it was not used to import LNG until late 2006.Since the majority of current deliveries to Aliaga are spot volumes, utilisation of the terminal depends on the level of pipeline supplies, weather conditions and the competitiveness of LNG versus piped imports. Imports to Aliaga reached record levels at the start of 2017 to meet high gas demand driven by particularly cold weather. High import levels were supported by a regas capacity expansion at Aliaga from 5.8 bcm/y to 8.8 bcm/y in December 2016 and again in September 2017 to 11.3 bcm/y.

What's included

This report contains

  • Document

    Aliaga LNG - LNG regas terminal.xls

    XLS 229.00 KB

  • Document

    Aliaga LNG - LNG regas terminal

    PDF 5.73 MB

  • Document

    Aliaga LNG - LNG regas terminal

    ZIP 5.79 MB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 7 images and tables including:

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3
  • Tariffs: Table 1
  • Tariffs: Table 2

Images

  • Map
  • Approximate Monthly Import Data by Country

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898