Asset report

Aliaga LNG - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Turkey's second regasification terminal located at Aliaga was completed in 2001. However it was not used to import LNG until late 2006 largely due to Turkey's over contracted gas position. The project was also hampered by legal issues faced by the terminal developer Egegaz in obtaining an import licence for the facility.Initially only BOTAS used the terminal to meet peak demand when other sources of supply were interrupted. In 2008 Egegaz received a licence from the Energy ...

What's included

This report contains

  • Document

    Aliaga LNG - LNG regas terminal.xls

    XLS 221.00 KB

  • Document

    Aliaga LNG - LNG regas terminal

    PDF 493.63 KB

  • Document

    Aliaga LNG - LNG regas terminal

    ZIP 550.85 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 7 images and tables including:

Images

  • Map
  • Approximate Monthly Import Data by Country

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3
  • Tariffs: Table 1
  • Tariffs: Table 2

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898