Turkey's second regasification terminal, located at Aliaga, was completed in 2001. However, it was not used to import LNG until late 2006.Since the majority of current deliveries to Aliaga are spot volumes, utilisation of the terminal depends on the level of pipeline supplies, weather conditions and the competitiveness of LNG versus piped imports. Imports to Aliaga reached record levels at the start of 2019 to meet high gas demand driven by particularly cold weather. High import levels were supported by a regas capacity expansion at Aliaga from 5.8 bcm/y to 8.8 bcm/y in December 2016 and again in September 2017 to 16.6 bcm/y.
Table of contents
- Key facts
- Location maps
- Terminal overview
- Utilisation
- Operational basis
- Offtake
- Tariffs
- Future expansions
Tables and charts
This report includes 5 images and tables including:
- Key facts: Table 1
- Key facts: Table 2
- Key facts: Table 3
- Map
- Approximate Monthly Import Data by Country
What's included
This report contains:
Other reports you may be interested in
Asset Report
Ain Sokhna FSRU (Hoegh LNG) - LNG regas terminal
Initial steps (pre-2014)Egypt has issued several tenders for the supply and installation of a Floating Storage and Regasification Unit ...
$1,200
Asset Report
Sergipe LNG - LNG regas terminal
Sergipe LNG is the floating offshore storage and regasification unit (FSRU) of Porto do Sergipe I, Brazil's first private-sector ...
$1,200
Asset Report
Bahrain LNG - LNG regas terminal
The Bahrain LNG terminal was commissioned in early 2020. The FSU, Bahrain Spirit, has been serving as a carrier since mid-2020