Report summary
Plans to import on a longer-term basis were disclosed as soon as 2010, as Kuwait started to import LNG via its FSRU. The scope and size of the onshore project have evolved over the years. KNPC awarded the pre-FEED and FEED (Front End Engineering and Design) study to a subsidiary of Foster Wheeler and a local partner in March 2014. The terminal is located at Al-Zour, 90 kilometres south of Kuwait City. More than ten ...
Table of contents
- Key facts
- Location maps
- Terminal overview
- Utilisation
- Operational basis
- Offtake
- Tariffs
- Future expansions
Tables and charts
This report includes 6 images and tables including:
- Key facts: Table 1
- Key facts: Table 2
- Key facts: Table 3
- Map
- Approximate Monthly Import Data by Total
- Approximate Monthly Import Data by Country
What's included
This report contains:
Other reports you may be interested in
Asset Report
Ain Sokhna FSRU (Hoegh LNG) - LNG regas terminal
Initial steps (pre-2014)Egypt has issued several tenders for the supply and installation of a Floating Storage and Regasification Unit ...
$1,200
Asset Report
Aliaga LNG - LNG regas terminal
Turkey's second regasification terminal, located at Aliaga, was completed in 2001 and has a regas capacity of 12.2 mmtpa.
$1,200
Asset Report
Mina Al-Ahmadi GasPort - LNG regas terminal
Mina Al-Ahmadi GasPort - LNG regas terminal report 2021
$1,200