Asset Report

Al-Zour LNG - LNG regas terminal

Get this report

$1,200

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Plans to import on a longer-term basis were disclosed as soon as 2010, as Kuwait started to import LNG via its FSRU. The scope and size of the onshore project have evolved over the years. KNPC awarded the pre-FEED and FEED (Front End Engineering and Design) study to a subsidiary of Foster Wheeler and a local partner in March 2014. The terminal is located at Al-Zour, 90 kilometres south of Kuwait City. More than ten ...

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 6 images and tables including:

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3
  • Map
  • Approximate Monthly Import Data by Total
  • Approximate Monthly Import Data by Country

What's included

This report contains:

  • Document

    Al-Zour LNG - LNG regas terminal

    PDF 2.10 MB

  • Document

    Al-Zour LNG - LNG regas terminal.xls

    XLS 76.53 KB

  • Document

    Al-Zour LNG - LNG regas terminal 2.xls

    XLS 35.47 KB