Asset report

Alaska LNG

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Alaska LNG (AK LNG) is aimed at monetising the stranded gas at Prudhoe Bay and Point Thomson. The two fields have combined proven gas reserves of approximately 31 tcf. The proposed LNG project involves construction of a gas treatment plant (GTP) on the North Slope linked by a new 800 mile (1 287 kilometres) pipeline to a liquefaction facility located at Nikiski on the Kenai Peninsula southern Alaska. The liquefaction facility is expected to have three trains at full build out with ...

What's included

This report contains

  • Document

    Alaska LNG

    PDF 5.34 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Commercial structure
  • Timeline
  • LNG marketing strategy
  • Shipping strategy
  • Upstream overview
  • Liquefaction plant overview
  • Costs
  • Fiscal and regulatory
  • Economic analysis

Tables and charts

This report includes 5 images and tables including:

Images

  • Potential commercial structures: state-led tolling project
  • Index Map

Tables

  • Key facts: Table 1
  • Timeline: Table 1
  • Upstream overview: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898