Bahrain LNG - LNG regas terminal
Report summary
Construction of the project started in January 2017 after reaching financial close in early December 2016. This is the first LNG import project in the Middle East to be a Public-Private Partnership. The terminal is constructed in the Northeast of Khalifa Bin Salman Port at Hidd Area. The Bahrain Spirit FSU arrived at the terminal with a cargo in July 2019. Construction and commissioning of the terminal was completed in January 2020. The Bahrain Spirit has been chartered out as a carrier since mid-2020
Table of contents
- Key facts
- Location maps
- Country overview
- Terminal overview
- Utilisation
- Operational basis
- Offtake
- Tariffs
- Future expansions
Tables and charts
This report includes 4 images and tables including:
- Key facts: Table 1
- Key facts: Table 2
- Key facts: Table 3
- Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Ain Sokhna FSRU (Hoegh LNG) - LNG regas terminal
Initial steps (pre-2014)Egypt has issued several tenders for the supply and installation of a Floating Storage and Regasification Unit ...
$1,200
Asset Report
Aliaga LNG - LNG regas terminal
Turkey's second regasification terminal, located at Aliaga, was completed in 2001 and has a regas capacity of 12.2 mmtpa.
$1,200
Asset Report
Sergipe LNG - LNG regas terminal
Sergipe LNG is the floating offshore storage and regasification unit (FSRU) of Porto do Sergipe I, Brazil's first private-sector ...
$1,200