Gorgon LNG - commercial overview
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Links to related reports
- Commercial structure
- Timeline
- LNG output
-
LNG contracts
- Chevron
- ExxonMobil
- Shell
-
Shipping
- Chevron Volumes
- Shell Volumes
- ExxonMobil Volumes
- Economic analysis
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Commercial structure: Image 1
- Timeline: Table 1
- LNG output: Image 1
- LNG contracts: Image 1
- Summary economics
- Breakeven economics (us$/mmbtu)
- FOB breakeven analysis (post-tax)
- Index Map
- Detail Map
- Shipping: Table 1
What's included
This report contains:
Other reports you may be interested in
Oman LNG - Oman LNG - commercial overview
The foundation development at Oman LNG consisted of trains 1 & 2 each with 3.6 mmtpa capacity.
$2,700Algeria LNG - Commercial Overview (Bethioua)
Algeria LNG's GL1Z and GL2Z plants are located at Bethioua in the Arzew area. Bethioua's first plant, GL1Z, came ...
$2,700Algeria LNG - Commercial Overview (Skikda)
In 1972 the first of the three trains at the GL1K plant at Skikda came onstream. The final trains came onstream in 1981.
$2,700