Algeria LNG - Commercial Overview (Bethioua)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Commercial structure
-
Timeline
- Plant development
- Gas Feedstocks
- LNG output
-
LNG contracts
- Contractual position overview
- Contract specifics
- GDF Suez contracts
- UK deliveries
- Costs
- Fiscal and regulatory
-
Shipping
- Economic assumptions
Tables and charts
This report includes 7 images and tables including:
- Key facts: Table 1
- Commercial structure: Image 1
- Timeline: Table 1
- LNG output: Image 1
- LNG contracts: Table 1
- Shipping: Table 1
- Index Map
What's included
This report contains:
Other reports you may be interested in
Algeria LNG - Commercial Overview (Arzew GL3-Z)
In 2008, Algeria LNG awarded an EPC contract for a new 4.7 mmtpa train at Arzew, called GL3Z.
$2,250Algeria LNG - Commercial Overview (Skikda)
In 1972 the first of the three trains at the GL1K plant at Skikda came onstream. The final trains came onstream in 1981.
$2,250Darwin LNG - commercial overview
The Darwin LNG plant is located at Wickham Point in the city of Darwin, northern Australia. The plant began LNG production in 2006.
$2,250