Asset report

Tanzania LNG - Commercial overview

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Since 2010 33 tcf of gas has been discovered in three large blocks in the Rovuma and Tanzania Coastal basins offshore southern Tanzania. Blocks 1 and 4 are operated by a Shell led consortium and Block 2 by a Statoil led consortium. The scope of the Tanzania LNG project has yet to be finalised but we that assume the liquefaction plant will operate under a non integrated tolling structure charging a fee sufficient to generate a 10% nominal rate of return. The majority of project value will ...

What's included

This report contains

  • Document

    2017 07 tanzania lng cash fl.xls

    XLS 152.50 KB

  • Document

    Commercial overview

    PDF 566.45 KB

  • Document

    Commercial overview

    ZIP 615.90 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Commercial structure
  • Timeline
  • LNG output
  • LNG contracts
  • Shipping
  • Economic analysis

Tables and charts

This report includes 9 images and tables including:

Images

  • Commercial structure: Image 1
  • LNG output: Image 1
  • FOB breakeven analysis (post-tax)
  • Index Map
  • Tanzania LNG Upstream Supply Area and LNG Plant Map

Tables

  • Key facts: Table 1
  • Timeline: Table 1
  • Summary economics
  • Breakeven economics (US$/mmBtu)

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898