Asset report

Gulf Gateway - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Update StatusDue to the growth in US gas production LNG imports have diminished considerably. As a result we will not be regularly updating this regas analysis.Key IssuesGulf Gateway became the world's first offshore deepwater terminal for receiving regasified LNG when the Excelsior Energy Bridge Regasification Vessel (EBRV) started to regasify its inaugural cargo from Malaysia on 17 March 2005. Located 187 km (116 miles) offshore Louisiana in the US Gulf of Mexico Gulf Gateway ...

What's included

This report contains

  • Document

    Gulf Gateway - LNG regas terminal.xls

    XLS 227.00 KB

  • Document

    Gulf Gateway - LNG regas terminal

    PDF 345.07 KB

  • Document

    Gulf Gateway - LNG regas terminal

    ZIP 401.60 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 5 images and tables including:

Images

  • Map
  • Approximate Monthly Import Data by Country

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898