Asset report

Huelva - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Construction of the Huelva terminal began in 1985 and operations in 1988. The terminal has been expanded several times and in 2007 it reached its current capacity of 1 209 mmcfd. A new 150 000 m storage tank was added in November 2010.In 2010 the terminal started to offer a reloading service to allow shippers to re export LNG to take advantage of higher prices in other markets. The first cargo was loaded onto the small (7 500 m ) Coral Methane in August 2010 for re export to ...

What's included

This report contains

  • Document

    Huelva - LNG regas terminal.xls

    XLS 101.00 KB

  • Document

    Huelva - LNG regas terminal

    PDF 387.75 KB

  • Document

    Huelva - LNG regas terminal

    ZIP 434.55 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 9 images and tables including:

Images

  • Map
  • Approximate Monthly Import Data by Total

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3
  • Tariffs: Table 1
  • Tariffs: Table 2
  • Tariffs: Table 3
  • Tariffs: Table 4

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898