Obskiy LNG - Commercial Overview
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Links to related report
- Commercial structure
- Timeline
- LNG output
- LNG contracts
- Shipping
- Economic analysis
Tables and charts
This report includes 8 images and tables including:
- Key facts: Table 1
- Commercial structure: Image 1
- Timeline: Table 1
- LNG output: Image 1
- Summary economics
- Breakeven economics (US$/mmBtu)
- Index map
- Detail map
What's included
This report contains:
Other reports you may be interested in
30 October 2020
Obskiy LNG - Upstream
Obskiy LNG - Upstream
Obskiy LNG is a newly planned project of NOVATEK in Yamal-Nenets. With a capacity of 5 mmtpa, it will be underpinned by the West ...
$3,10016 July 2020
Yamal LNG - Commercial Overview
Yamal LNG - Commercial Overview
The giant South Tambeiskoye gas condensate field is located on the remote Yamal Peninsula, in West Siberia. It underpins Yamal LNG, a ...
$2,25003 April 2020
Vysotsk LNG - Commercial Overview
Vysotsk LNG - Commercial Overview
Vysotsk LNG is a 0.66 mmtpa project, which is operated by CryoGAS-Vysotsk, a JV between NOVATEK (51%) and Gazprombank (49%). The plant ...
$2,250