Asset Report
Pakistan proposed LNG regas projects
Report summary
Market OutlookPakistan is an established gas market, with gas infrastructure stretching across much of the country. Gas demand is expected to grow simultaneously as domestic production declines leading to a requirement for imports. However, the country's struggling economy has affected the growth of the gas and power sector. Energy policy has lacked continuity due to regular government changes and a prolonged circular debt crisis, deterring private and public investments. Low-cost ...
Table of contents
- Location maps
- Proposed projects - overview
- Location detail
Tables and charts
This report includes 6 images and tables including:
- Map
- Location detail: Table 1
- Location detail: Table 2
- Location detail: Table 3
- Location detail: Table 4
- Location detail: Table 5
What's included
This report contains:
Other reports you may be interested in
Asset Report
Indonesia proposed LNG Regas projects
A number of companies are eyeing new regasification terminals in Indonesia, particularly in West Java. This is driven by the declining ...
$1,200
Insight
China regas tracker 2024
Monthly update of LNG receiving terminals projects, storage capacity forecasts and available window slots offered by PipeChina
$950
Asset Report
Cameron LNG - Phase 1
Cameron LNG is a three-train development on the site of the existing Cameron LNG regas facility. The liquefaction facilities, and an ...
$2,250