Asset report

Sakaide - LNG regas terminal

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

In January 2007 full scale construction started at the Sakaide terminal located in the Bannosu district of Sakaide City Kagawa Prefecture. Kawasaki Heavy Industries was awarded the terminal's EPC contract in March 2006 and site preparations at the facility started in October 2006. The terminals received its first commissioning cargo in January 2010 with commercial operations starting in March 2010.

What's included

This report contains

  • Document

    Sakaide - LNG regas terminal

    PDF 375.27 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 5 images and tables including:

Images

  • Location maps: Image 1
  • Approximate Monthly Import Data by Country

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898