Asset Report

Sungai Udang - LNG regas terminal

From

$700.00

You can pay by card or invoice

From

$700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The 3.8 mmtpa Sungai Udang regasification terminal is located in Melaka, consisting of a moored jetty regasification unit with two converted LNG ships, Tenaga Satu and Empat, as the storage tanks. The terminal is connected to the existing PGU II transmission line via a 3 km tie-in and a 30 km spur line parallel to the existing one. This facility had faced repeated delays but begun operations in May 2013. The terminal is estimated to cost RM1.7 billion (US$ 574 million) including the ...

What's included

This report contains

  • Document

    Sungai Udang - LNG regas terminal.xls

    XLS 159.50 KB

  • Document

    Sungai Udang - LNG regas terminal

    PDF 619.41 KB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 5 images and tables including:

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3

Images

  • Map
  • Approximate Monthly Import Data by Country

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898