Asset report

Abcourt-Barvue zinc mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Abcourt Barvue property is located in the Abitibi area north western Quebec Canada. The project comprises a series of three open pits namely Barvue Abcourt East and Abcourt West with an underground operation commencing in year 6. A combination of open pit and underground mining methods will be used to produce zinc and silver over a 10 year mine life with approximately 80% of the measured resource mined by open pit to a maximum depth of 166m.

What's included

This report contains

  • Document

    Abcourt-Barvue Project zinc mine

    XLS 507.50 KB

  • Document

    Abcourt-Barvue zinc mine project

    PDF 724.02 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Infrastructure
  • Costs
  • Operations
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Key facts: Table 2

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898