Al Masane zinc mine
Report summary
Construction commenced in July 2009 and was reported to have been completed in November 2011. While current reserves are sufficient for a 10 year mine life, AMAK has mining rights on a number of others deposits in the area which, if exploited, could considerably lengthen the mine life. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Al Masane copper mine
A detailed analysis of the Al Masane copper mine.
$2,250
Asset Report
Al Amar zinc mine
A detailed analysis of the Al Amar zinc mine.
$2,250
Asset Report
Tambo Grande zinc mine project
A detailed production and cost competitive analysis of the Tambo Grande zinc mine project.
$2,250