Asset report
| |
8 Pages

Alumínio aluminium smelter


Alumínio aluminium smelter

Report summary

Line 13 (Sala 8) was scheduled for commissioning in 2009-2010, but has been pushed back.  By Q1 2011, about 1/3 of the total capex had been dispersed.  On the restart of construction work, the line will take about 18 months to complete and will use the same VSS 127kA technology.  Due to high power tariffs we have removed Line 13 from our base case. Along with increased operating amperage on Lines 4-12, plant capacity could reach as high as 600kt/a.  Expansion beyond this would require...

What's included?

This report includes 2 file(s)

  • Alumínio aluminium smelter PDF - 526.26 KB 8 Pages, 3 Tables, 1 Figures
  • Alumínio aluminium smelter XLS - 98.00 KB

Description

This Aluminium Metals Smelter report provides a detailed analysis of the cost profile, process overview, products and key issues for this asset, as well as a detailed location map.

For aluminium producers, advisors and financial companies, this report provides an understanding of the value and efficiency of the operation. Use this report to understand the competitive position, identify acquisition opportunities and strengthen business strategies.

Wood Mackenzie's cost methodology is the established global industry standard, relied on by the world’s leading investment banks and mining companies to make strategic, operational and investment decisions.

Our analysts are based in the markets they analyse, working with high-quality proprietary cost databases and cost curve analyses to write consistent and reliable insights. Our database includes over 2,450 asset analyses covering more than 1,000 companies worldwide.

  • Key facts
  • Summary and key issues
  • Location maps
  • Raw materials
    • Alumina Sources
    • Anode Sources
  • Process overview
    • Power
      • Power Type
      • Power Source
      • Power Supplier
      • Power Contract
  • Products
  • Timeline

In this report there are 4 tables or charts, including:

  • Key facts
    • Key facts: Table 1
  • Summary and key issues
  • Location maps
    • Detailed map
  • Raw materials
  • Process overview
    • Process overview: Table 1
    • Process overview: Table 2
  • Products
  • Timeline
Requester's name : .............
Department : .............
Authoriser's Name : .............
Authoriser's signature : .............
Date : .............
Cost Centre : .............

Questions about this report?

Frequently Asked Questions

Mailenquiries@woodmac.com
  • Europe: +44 131 243 4699
  • Americas: +1 713 470 1900
  • Asia Pacific: +61 2 8224 8898
contact us

Why Wood Mackenzie?

As the trusted source of commercial intelligence for the world's natural resources sector for more than 40 years, we empower clients to make better strategic decisions with objective analysis and advice. Find out more...