Asset Report

Amulsar gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Amulsar will be an open pit operation utilising conventional truck and shovel mining methods. The ore production rate will be approximately 10Mt/a. Ore will be processed by two stage crushing, heap leaching, an adsorption, desorption, recovery plant (ADR) and refining. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Amulsar gold mine project

    XLS 118.00 KB

  • Document

    Amulsar gold mine project

    PDF 1.24 MB

  • Document

    Amulsar gold mine project

    ZIP 1.07 MB