Asset report

Amulsar gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Amulsar will be an open pit operation utilising conventional truck and shovel mining methods. The ore production rate will be approximately 10.5Mt/a over a 10 year mine life. Ore will be processed by two stage crushing heap leaching an adsorption desorption recovery plant (ADR) and refining.

What's included

This report contains

  • Document

    Amulsar gold mine project

    XLS 127.50 KB

  • Document

    Amulsar gold mine project

    PDF 634.57 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Operations
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898