Asset Report
Amulsar gold mine project
Report summary
Amulsar will be an open pit operation utilising conventional truck and shovel mining methods. The ore production rate will be approximately 10Mt/a. Ore will be processed by two stage crushing, heap leaching, an adsorption, desorption, recovery plant (ADR) and refining. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- CAPEX
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Yaoure gold mine project
A detailed analysis of the Yaoure gold mine project.
$2,250
Asset Report
Yellowknife gold mine project
A detailed analysis of the Yellowknife gold mine project.
$2,250
Asset Report
Cameron gold mine project
A detailed analysis of the Cameron gold mine project.
$2,250