Asset Report
Andash gold mine project
Report summary
The Andash project is 280km from the capital city of Bishkek and 45km from regional centre Talas, north-western Kyrgyz Republic. The project is planned as an open pit mine with conventional truck and excavator open pit mining methods. Life of mine (LOM) is estimated at 6 years. The processing circuit will comprise 3 stage crushing, grinding and flotation with average annual gold production estimated at 70koz.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- CAPEX
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Yaoure gold mine project
A detailed analysis of the Yaoure gold mine project.
$2,250
Asset Report
Yellowknife gold mine project
A detailed analysis of the Yellowknife gold mine project.
$2,250
Asset Report
Cameron gold mine project
A detailed analysis of the Cameron gold mine project.
$2,250