Asset report

Ann Mason copper mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The Ann Mason project comprises two main copper molybdenum porphyry deposits (Ann Mason and Blue Hill) with several under explored targets. An open pit mining operation is planned with processing by conventional sulphide flotation. Average annual copper production of 241Mlb is expected over a 21 year mine life. The Blue Hill deposit is located 1.5km north west of Ann Mason and predominantly hosts near surface oxide mineralisation which is amenable to low cost heap leaching and SxEw ...

What's included

This report contains

  • Document

    Ann Mason copper mine project

    XLS 521.00 KB

  • Document

    Ann Mason copper mine project

    PDF 517.75 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Infrastructure
  • Costs
  • Production
  • Operations
  • Sales contracts
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Key facts: Table 2

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898