Asset report

Antamina copper mine

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

Antamina exploits a skarn deposit through a conventional open pit mine (typical stripping ratio of 3.5) and a 145kt/d ore polymetallic concentrator processing 8 type of ores and producing 5 types of concentrates. At the end of 2015 Antamina was processing above 165kt/d ore in the mill. The concentrates produced are copper concentrate bornite concentrate zinc concentrate moly concentrate and Pb Bi concentrate. The copper and zinc concentrates are transported via a 302km pipeline to the Punta Lobitos port in Huarmey owned by Antamina.

What's included

This report contains

  • Document

    Antamina copper mine

    PDF 582.93 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
    • Mining
    • Processing
    • Operating
    • CAPEX
  • Sales contracts
  • Timeline
  • Economic assumptions
  • Fiscal and regulatory

Tables and charts

This report includes 12 images and tables including:

Images

  • Detailed map
  • Production: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Economic assumptions: Table 1
  • Operations: Table 1
  • Costs: Table 1
  • Costs: Table 2

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898