Asset report

Aurizona gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

T The property comprises the Piaba and Tatajuba (2.4km west southwest of Piaba) deposits located in the Godofredo Viana Municipality between the cities of Sao Luis and Belem. Aurizona is an open pit operation that utilises conventional drill blast load and haul mining methods. The process plant comprises a conventional carbon in leach (CIL) circuit.

What's included

This report contains

  • Document

    Aurizona gold mine

    XLS 126.00 KB

  • Document

    Aurizona gold mine

    PDF 602.55 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Operations
  • Infrastructure
  • Sales contracts
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898