Asset Report

Aynak copper mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Aynak project is located within a mountain basin 35km SE of Kabul in Afghanistan at elevations of 2,275-2,675 masl. The civil war in Afghanistan in 1989 halted exploration in the Aynak area until a joint venture between Metallurgical Corporation of China (MCC) and Jiangxi Copper Group acquired the mine in November 2007. Although Aynak is permitted and reported to be in early stages of construction, the project is still considered high-risk considering the ongoing political instability in Afghanistan.

Table of contents

  • Summary
  • Key issues
  • CAPEX
  • Mining
  • Process

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Aynak copper mine project

    PDF 1.11 MB