Asset Report

Back Forty zinc mine project

Get this report

$2,250

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQ's about online orders
- Find out more about subscriptions

08 March 2019

Back Forty zinc mine project

Report summary

Back Forty is a complex polymetallic deposit. It includes both, sulphide mineralisation and gold-bearing gossans. The Feasilibity Study, released in August 2018, planned for the project's sulphide ore to follow a conventional open pit and differential flotation process to produce copper, zinc and lead concentrates. We estimate 2022 as production start year. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
    • Power
    • Water
  • CAPEX
  • Operating

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Back Forty zinc mine project

    XLS 503.50 KB

  • Document

    Back Forty zinc mine project

    ZIP 1.06 MB

  • Document

    Back Forty zinc mine project

    ZIP 1.06 MB

Trusted by leading organisations