Asset Report
Back Forty zinc mine project
Report summary
Back Forty is a complex polymetallic deposit. It includes both, sulphide mineralisation and gold-bearing gossans. The 2020 Preliminary Economic Assessment outlines mining by a combination of open pit and underground methods. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Emissions
- Mining
-
Processing
- Power
- Water
- CAPEX
- Operating
Tables and charts
This report includes 2 images and tables including:
- Back Forty Project Emission Intensity Quartile Ranking - Total global production - Tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Back Forty copper mine project
A detailed analysis of the Back Forty copper mine project.
$2,250
Asset Report
Pine Point zinc mine project
A detailed analysis of the Pine Point zinc mine project.
$2,250
Asset Report
Comstock (Zeehan) zinc mine project
A detailed analysis of the Comstock (Zeehan) zinc mine project.
$2,250