Asset report

Back Forty zinc mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Back Forty is a complex polymetallic deposit. It includes both, sulphide mineralisation and gold-bearing gossans. The Preliminary Economic Assessment (PEA), released in July 2014, planned for the project's sulphide ore to follow a conventional open pit and differential flotation process to produce copper, zinc and lead concentrates. It also included a separate agitated leaching route to recover gold – silver dore from the oxide ore.

What's included

This report contains

  • Document

    Back Forty zinc mine project

    PDF 788.09 KB

  • Document

    Back Forty zinc mine project

    XLS 504.00 KB

Table of contents

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898