Asset report

Bilbao zinc mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Bilbao project comprises a skarn deposit to be mined mainly by longhole open stoping underground mining method and processed through a concentrator with 2kt/d ore capacity. It is expected to produce a lead concentrate and a zinc concentrate both with silver content. The concentrates are to be exported through the Manzanillo port. The mine life of the project was estimated at 8 years.

What's included

This report contains

  • Document

    Bilbao Project zinc mine

    XLS 512.00 KB

  • Document

    Bilbao zinc mine project

    PDF 658.89 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Operations
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 4 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898